We had a new hot water heater installed last Friday and while the plumbers were here we had them install some shut-off valves in the ceiling above the fabric shelves in my basement studio. Since I was not yet approved for stairs, my husband took it on himself to move the base cabinets that support the ironing board and to remove a couple of shelves in the area. He borrowed two long tables from our church to have a surface to put the fabric on.
Note that he not only carefully kept the color-coordinated stacks intact, but he made certain to keep them in the same order as they were on the shelf!At Monday's PT I was approved for stairs so I ventured down the 16 steps (with assistance) to assess his handiwork. I am still not stable enough to help with restoring order, so while he labored I sat amd stitched two more blocks to add to the design wall. The first time my foot had been on the pedal since the end of January. It felt SEW good!!! But I was wasted by the time I climbed back up those 16 steps.